Sell Nickel ore 1.8 UP

With full corporate responsibility, we’re PT. EPK do hereby to confirm that we’re willing and able to sell the product Nickel ore stated FOB Vessel are mentioned here in below, under the following term and conditions:
Commodity : NICKEL ORE
Origin : POMALAA SOUTH EAST – SULAWESI, INDONESIA
Specification : as below
Nickel 1.8% Reject
Fe 13%-20%
TM 30-35%
SiO 2 40%

Demurrages : after 10 days
Infection by : independent surveyor 
Loading Rate     : 4.000-8000wmt/days
Barge capacity     : 270 Feet
QUANTITY     : 50.000WMT-100.000WMT/ MONTH
1.    Shipping : Minimum port crane 4 units should equipped Vessel plus 4 grabs with minimum Capacity 8 CBM or Vacuum and ( Barge 320 Feet ).
2.    Delivery : Within 30 days, include Loading schedule from buyer.
3.    Loading Port : Kolaka-Pomala, South East Sulawesi, Indonesia.
4.    Inspection : Quality and Quantity determined at Loading port by * independent surveyor has been appointed by both parties. All of coast and charges of inspection incurred and distributed position to mother vessel by buyers.
5.    Contract Length : We willing to sign (one 1 year) contract minimum.
6.    Review Price : Every 3 month.
7.    Other : Term and conditions, if any to be discussed after seller and buyer agree with price which seller offer. `
Price Offer : U$D.47/WMT FOB Vessel with cash Payment (40% - 40%-20%) or
LC At Sight 80% and 20% Cash Price U$D 52